WritingTurn a strong XR prototype into a production planWritingHow to evaluate an XR studio proposalWritingHow to scope an immersive project without killing the ideaWritingChoose Slow DopamineWritingWhat can you prototype in XR in two weeks?NowGlass Angels, our VR piece set in the Owl House in Nieu-Bethesda, was on the Fak'ugesi 2026 exhibition floor. Mosaic owl headset and all.DistributionVenice Immersive — Official Selection 2024 — StrangewaysDistributionVenice Immersive — In Competition 2021 — Spirit of Place · Selection — BlissDistributionVenice Best of Worlds — 2024 — Mormoverse, Under The PillowDistributionEmmy Awards — VRChat previews — Reeducated, ISS ExperienceDistributionWebby Awards — People's Voice 2023 — Oxymore, Jean-Michel JarreDistributionSpirit of Raindance — BloodbathDistributionSpirit of Raindance — MyceliaDistributionLoeries — Silver & Bronze — Life of Confidence, Made In The CapeDistributionSmarties — Silver — FVRM for AbsaDistributionCreative Circle — Made In The Cape MarketDistributionMona — Design Prize — Renaissance of the Metaverse 2022DistributionGlass Angels (2026) — Quest 3 & 3S prototype · 2026DistributionStrangeways: The Only Way Out Is Through (2026) — Live VR theatre · 9–11 Oct 2026DistributionVenice Immersive Worlds Gallery (2024–2026) — Official venue · 3 editions · 145,000+ VRChat visitsDistributionThe Cradle of Humankind (2025–Present) — iOS & Android · UNESCO siteDevSite config — YAML-driven layout and theme from Obsidian vault
← Back to writing

Turn a strong XR prototype into a production plan

A prototype proves an experience; production proves a team can deliver it.

I wrote this because strong extended reality (XR) prototypes often create false confidence. The central interaction works, but the route to opening day remains vague.

What's the problem?

A prototype answers a narrow question. It might test whether someone understands a gesture, believes the virtual scale or enjoys a shared AR moment.

Production asks many less glamorous questions at once. Someone must create the final assets. The team must support chosen devices, train staff and prepare for tracking failures under festival lighting.

Teams often respond by turning the prototype backlog into a longer feature list. That misses the point. A production plan is a map of dependencies, decisions and evidence.

The common mistake is treating everything in the prototype as proven. Usually, only one interaction has earned that status. The content pipeline, performance limits, onboarding, analytics, accessibility and venue operations may still be guesses.

Another mistake is planning by department alone. Design finishes, then art starts, then development begins. XR rarely behaves so neatly. A beautiful scene may run badly on the target headset. A reliable interaction may need different animation. Work must meet often enough to expose those conflicts early.

What's the solution?

Start with a proof map. List each part of the experience and label it proven, assumed or unknown. Proven means you observed it working with representative users, hardware and conditions. A confident team opinion does not count (sadly, confidence remains free).

Next, turn the map into four practical workstreams:

  1. Experience: flow, interaction, onboarding, comfort and accessibility.
  2. Content: 3D assets, sound, writing, animation and approvals.
  3. Technology: application code, device support, performance, data and deployment.
  4. Operations: venue layout, staffing, hygiene, charging, connectivity and recovery.

Give every workstream an owner and a clear output. Then connect them through milestones based on evidence rather than percentages.

For example, imagine a festival VR piece where visitors restore a virtual coral reef by placing sound-emitting objects. The prototype proved that placement felt satisfying. Production should not jump straight to building all twelve scenes.

The first milestone could be a complete three-minute slice using final-quality art on the target headset. The next could test six visitors per hour with real staff. A later milestone could run the installation for a full day, including resets, battery changes and one simulated network failure.

Each milestone should retire a named risk. The three-minute slice tests visual performance and interaction clarity. The throughput test checks queues and facilitation. The full-day run checks reliability and operations.

Keep a risk register beside the schedule. A risk register is simply a list of things that could damage cost, timing or quality. Record the warning sign, owner, response and decision date. "Headset overheats" is too vague. "Frame rate drops below target after ten minutes in Scene 4; technical lead tests the reduced-particle build by Friday" can guide action.

Finally, build the launch path backwards. Start with public opening, then place the venue test, content lock, feature lock and final prototype review. Leave time between them for fixes. An approval meeting is not contingency time.

What's next?

  1. Mark every prototype element as proven, assumed or unknown.
  2. Create four workstreams, each with one owner and one next output.
  3. Define three evidence-based milestones that remove your largest launch risks.

Share your production map with us, or ask where your prototype still carries hidden assumptions.